Open Beta Coming Soon!

PREPRODUCTION,
LINED UP.

From screenplay to call sheet, Lína is the all-in-one production management tool built for modern filmmakers.

No AI. No bloated workflows. Just clean, simple tools.

Screenshot Coming Soon!

EVERYTHING YOU NEED,
NOTHING YOU DON'T

Every tool a production needs — from first draft to final day of shooting — in one cohesive workspace. No AI, no bloated workflows, just clean, simple preproduction and management.

LINED SCRIPT

Import your screenplay and start lining. Each line you draw adds a shot to the shot list, creates the storyboard frame, and influences the schedule. Everything's connected, and the screenplay is at the center of it all.

BREAKDOWNS

Tag every element in every scene — cast, props, wardrobe, vehicles, special effects — with color-coded categories and detailed notes. Breakdown data transfers to the schedule and call sheet where needed.

STRIPBOARD & SCHEDULE

Drag-and-drop scheduling with EP-style color coding, day breaks, meal breaks, and automatic Day Out of Days report generation. Plus, a complexity score gives you an idea of how heavy the day will be.

CAST & CREW

Manage your entire team with contact details, role assignments, availability tracking, and CSV import/export for quick setup.

CALL SHEETS

Generate professional call sheets tied to your schedule. Includes weather, crew calls, scene details, and one-click PDF export, along with email tracking so you can make sure everyone sees their call sheet.

SHOT LISTS

Plan every shot with framing, lens, movement, and equipment details. Linked directly to your lined script for seamless coverage tracking.

FROM SCRIPT TO SET
IN FIVE STEPS

Lína follows a natural workflow; each step influencing the next.
Each section shares important data, streamlining the process.

01

IMPORT YOUR SCREENPLAY

Upload a Fountain or text version of your screenplay. Lína automatically parses scene headings, characters, action lines, and dialogue — and calculates accurate page counts using industry-standard 1/8th measurements.

Screenshot Coming Soon!
02

LINE THE SCRIPT

Intuitively create shots and plan coverage by lining the script directly on the page. Each line drawn creates an entry on the shot list, and that data is used throughout your Lína project.

Screenshot Coming Soon!
03

BREAK IT DOWN

Using a familiar breakdown form, tag elements in the screenplay - characters, props, wardrobe, atmosphere, etc... Breakdown data helps with scheduling and call sheets.

Screenshot Coming Soon!
04

SCHEDULE IT

Generate a schedule in strip board format, dragging the scene strips and dropping in production order. Add meals, day breaks, and notes. Use the daily complexity score to ensure you don't overwork your team.

Screenshot Coming Soon!
05

SEND THE CALL SHEETS

Automatically generate call sheets for each day using data from the schedule, breakdown, and shot list. Send call sheets via trackable emails to ensure receipt.

Screenshot Coming Soon!

SIMPLE, HONEST PRICING

Start free, upgrade when you're ready, cancel anytime. No hidden fees, no per-seat charges. Just clean preproduction.


We keep our prices low to reduce the barrier for indie filmmakers and students just getting their start in the industry. Production management tools don't need to be expensive!

EDUCATION

FREE
Users with EDU emails

Sign up with a .edu email address and get access for free!

  • 2 active projects
  • 1 draft per project
  • 1GB Storage
  • All tools included
  • Basic collaboration (view)
Coming Soon

PRO

$14.95/mo
Billed Monthly

For professionals managing multiple projects collaboratively.

  • 10 active projects
  • Unlimited drafts
  • 10GB Storage
  • All tools included
  • Team collaboration
Coming Soon

START YOUR NEXT
PRODUCTION TODAY

Join filmmakers who are already using Lína to bring their projects from page to screen, faster.